Getting started
What is IRIS?
IRIS Maritime PMS keeps the planned maintenance, defects, spare parts, certificates, safety and voyage records of your fleet in one place. The office and the ships work on the same records. On board, the Ship App works without internet and sends everything when the ship is back online.
How do I sign in the first time?
Your administrator gives you your e-mail and a temporary password. After signing in, IRIS asks you to choose your own password: at least 10 characters, with letters and numbers.
I forgot my password.
Ask your company administrator (Users → your name → Reset password). You get a new temporary password and choose your own after signing in. A Super Admin of IRIS support can also reset the company administrator.
Why is my sign-in blocked?
After 5 wrong passwords, sign-in is blocked for a few minutes for safety. Wait and try again, or ask your administrator to check that your account is active.
What does my role allow?
Company Admin: everything, incl. users and settings. Superintendent: all vessels; approves postponements, deferrals and requisitions. Office Viewer: read only. Master and Chief Engineer: their own vessel; verify jobs, request postponements and deferrals. Officer / Engineer: do jobs, hours, defects, stock. Crew: assigned jobs and defects.
Why can I only see one vessel?
Ship roles see the vessel they are signed on to (Vessel → Crew on board). Ask the office to sign you on to the right vessel.
What should I check every day?
Open the Dashboard and clear its alerts: jobs to verify, my jobs, expired deferrals, certificates and stock below minimum. Then enter the day's running hours. About 10 minutes.
How do I search?
Use the search box at the top (or press /). It finds vessels, work orders, defects, spare parts and more.
Can I use IRIS at night or on a dark screen?
Yes. The sun / moon button at the top switches between Day, Night and Auto (follows your device).
Vessels & equipment
How do I add a vessel?
Vessels → Add vessel. Fill in the name, a 3–4 letter code (used in work order numbers), type, flag and class. Flag, port of registry and builder offer suggestions while you type.
What is the fastest way to add the machinery of a vessel?
Open the vessel → Equipment → Standard set. Choose the vessel type, number of main engines and generators, and whether there is a lifeboat. IRIS lists the usual equipment with SFI codes; untick what is not on board, add makers and models, and save. Tick Also add the standard jobs to get the job plans from the library at the same time.
Can I import equipment from Excel?
Yes. Vessel → Equipment → Import: download the IRIS template, fill in the Equipment and Job plans sheets, upload and check the preview before saving. Rows with mistakes are shown with the reason.
How do I add one machine?
Vessel → Equipment → Add. Choose the Category first: IRIS fills the department, type and a name, and suggests makers and models for that kind of machine.
What is an equipment model?
A maker + model (for example Cummins KTA38-M). Machines of the same model on several vessels share its job templates and manuals. When you type a maker and model on a machine, IRIS links or creates the model for you.
What does "Critical" or "Class item" mean on a machine?
Critical: a failure could cause a hazardous situation (ISM 10.3); its jobs get no grace days and must be verified. Class item: surveyed under the class PMS scheme; postponing its jobs needs a class or flag note.
How do I remove a machine that was taken off the vessel?
Edit it and set the status to Removed. The history is kept, and its job plans stop.
How do I sign crew on to a vessel?
Vessel → Crew on board → add the person with their rank and sign-on date. Sign them off when they leave; their history stays.
Jobs, due list & work orders
How does IRIS know when a job is due?
Each job plan has an interval by calendar, by running hours, or whichever comes first. IRIS counts from the last time it was done (or from the original due date for fixed class jobs) and moves the due date when running hours come in.
Why does a new job show as "Due"?
It has no "last done" date yet. Enter the last done date (and hours) on the job plan, or do the job once, and IRIS calculates the next due date.
What does "Overdue" mean?
The job is past its due date or hours plus the grace period (default 7 days for normal jobs, 0 for critical and class jobs; set in Company Settings).
How do I add standard jobs to a machine?
Open the machine in the vessel's Equipment tab. Under Add job plans from the library, tick the suggested jobs, optionally enter when they were last done, and press Add selected. The library suggests jobs by category or equipment model.
How do I complete a job?
Open the work order, mark each checklist step Done, N/A or Not done (a note is needed for Not done), enter the readings, parts used and photos, then Complete job. Save progress keeps it open.
Who verifies a job?
Critical and class jobs wait for the Master or Chief Engineer to verify them (Work Orders → Awaiting verification). The person who completed a job cannot verify it. Return sends it back with a note.
How do I postpone a job?
Due List → the job → Postpone. It needs the Superintendent's approval; critical and class jobs need a note on how class or flag accepted it. One postponement per due date.
A closed job has a mistake. Can I change it?
Closed jobs are never edited. Use Amend on the job card: IRIS keeps the old value, the new value and the reason.
How do I assign a job to someone?
Open the job → Assign. Unassigned jobs show to everyone of the responsible rank.
Running hours
How do I enter running hours?
In full IRIS: Counters (or the vessel's Counters tab). In the Ship App: Hours. Type the number shown on each meter and save. Leave a line empty to skip it.
Why was my reading refused?
A reading lower than the last one, or more hours than have passed since the last reading, is refused with the reason. Check the meter and the date.
The hour meter was replaced. What do I do?
Counters → the counter → Replace / reset meter (Chief Engineer). The total hours stay continuous, so due dates stay right.
What is a "stale counter"?
A counter with no new reading for some days. Hour-based jobs cannot move correctly without readings, so enter hours daily.
Defects
How do I report a defect?
Full IRIS: Defects → Report defect. Ship App: Defect. Choose the equipment, say in one line what is wrong, add details, immediate action, severity and photos. Works offline in the Ship App.
Who is told about a defect?
Critical, class or safety defects are e-mailed to the office as soon as they reach the server, and can be sent by SMS when SMS alerts are on.
How do I repair a defect?
Open the defect → Raise repair WO. The defect closes when its repair job is closed (and verified, if critical).
Can a repair wait?
Yes: Defer repair with a target date. Minor and major defects are deferred on board; critical, class or safety defects need the Superintendent, and class ones the surveyor's reference.
Ship App & offline
How do I set up the Ship App on a phone, tablet or ship PC?
While online, sign in to full IRIS on the device, open Ship App → Connect this device, name it (e.g. "Engine room tablet") and press Connect. Then install it: Android/PC Chrome or Edge → Install; iPhone/iPad Safari → Share → Add to Home Screen. The device stays connected for 90 days.
Does it work without internet?
Yes. Jobs, hours, defects with photos, quick updates, stoppages, noon reports and incidents are saved on the device and sent automatically when the ship is back online.
What is the Outbox?
What is waiting to be sent. Yellow: waiting for a connection (normal at sea). Red: the server refused the change, with the reason; read it, then discard or correct and save again. Nothing is ever applied twice.
There is a Windows program for the ship PC?
Yes, IRIS Ship for Windows: Ship App → Connect this device → download the installer. It keeps working when the ship PC has no internet.
The device was lost or broken.
Tell the office. They sign it out under Users (the person → devices), and it can no longer sync.
Careful with "Sign out device"
Do not sign out a device while changes are still in the Outbox: they would be deleted from the device. Sync first.
Can I scan a QR label?
Yes. Scan QR in the Ship App opens the machine or store bin: open jobs, running hours, manuals and Report a defect. Print labels under Documents → QR labels.
Why does the app say "No internet" although Wi-Fi is on?
The ship network is up but the IRIS server cannot be reached (no internet on the ship). Keep working: everything waits in the Outbox.
Fleet status, stoppages & voyage
What is a quick update?
A one-minute status from the ship: at sea, in port, at anchor, dry dock or idle, with position, next port and ETA, fuel and water on board. Ship App Quick update or Fleet Status → Quick update. Do it daily and at every arrival and departure.
How do I log a stoppage?
Ship App Stopped now → Log a stoppage, or Stoppages in full IRIS. Choose the machine or Whole vessel stopped, the type and Off-hire if the vessel cannot earn. End it with Running again; the duration is counted automatically.
How is availability calculated?
100 % minus the time the whole vessel was stopped (overlaps counted once). See Reports → Availability & downtime.
How do I send a noon report?
Ship App Noon report or Voyage & Fuel: position, distance, hours and fuel on board (ROB). IRIS works out the fuel used, litres per hour and per nautical mile.
How does the Oil Record Book work?
Entries by MARPOL code A–I. An entry is never changed: Correct adds a new entry and the original stays struck through. Bunkering is entered automatically (code H). The Master signs with Sign as Master; Print gives the book for PSC.
Spare parts & purchasing
How do I add many spare parts quickly?
Spare Parts → Quick add common parts: choose the kind of machine and the maker, tick the parts usually kept on board and save. You can link them to a machine at the same time. Or import them from Excel on the vessel's Spares tab.
I do not know the part number yet.
Leave it blank in Quick add: IRIS gives a temporary code (e.g. ME-4F2A9C). Replace it with the maker's number later on the part's page.
How do I receive, count or adjust stock?
Spare Parts or the vessel's Spares tab → Stock → Receive / Count / Adjust. An adjustment needs a reason. Monthly counts keep the figures right.
How do I order parts?
Spares tab → Request parts below minimum, or Requisitions → new. Check the draft, then Submit. Receive the delivery against the requisition so the stock is updated.
How do quotations and purchase orders work?
On the requisition, tick suppliers under Quotations, type their prices; the lowest complete one is marked. After approval, Award issues the PO (with VAT, EWT and currency), which you can print or e-mail to the supplier.
Why is a PO "pending approval"?
It is above the company's approval limit (Company Settings). Someone other than the person who raised it must approve it before it can be sent.
Can I send parts to another vessel?
Spare Parts → the part → Stock → Send. Both vessels' stock is updated together.
Certificates & documents
When do certificate reminders come?
90, 60, 30 and 7 days before expiry (settable in Company Settings), on the Dashboard, the bell and by e-mail.
How do I record a renewal or survey?
Vessel → Certificates → the certificate: record the survey, endorsement, extension or renewal with the scan. The history is kept.
What should I send to class or MARINA?
Vessel page → Audit PDF: certificates, overdue critical/class jobs, postponements, defects, class work and running hours, with signature lines.
Where do I keep my own COC, BST, medical…?
User menu → My certificates. They are flagged 90 days before expiry. The Master sees the crew on board; the office sees everyone.
Where are the manuals?
Documents: link a manual to a machine, an equipment model (shows on every vessel with that machine), a vessel or the whole company. A new revision keeps the old one as superseded.
Safety, ISM & permits
How do I report an incident or near miss?
Ship App Incident / near miss (also offline) or Safety & ISM → Report incident. The office investigates, adds corrective actions and closes the report.
How do corrective actions work?
Findings from inspections and audits become corrective actions with an owner and due date. Press Action done with the evidence; the office verifies and closes it, or sends it back.
How do I get a permit to work?
Permits to Work → Request permit (or from the work order). Answer the checklist, review the risk assessment and record the gas test for hot work and enclosed space. The Master or C/E authorises it when nothing is missing. Close it when done.
Why can I not sign off a job?
Jobs marked "permit required" need an authorised permit first (when the company has this rule on).
Where do I record drills?
Vessel → Safety tab. The drill matrix shows when each drill is due.
Emissions, CII & EU ETS
Where do the emission figures come from?
From the noon, departure and arrival reports. Fuel used (litres, from the fuel on board and bunkering) × density = tonnes of fuel; × the IMO carbon factor (3.206 for gas oil) = tonnes of CO₂. Nothing extra to type on board.
How do I get a CII rating?
Emissions & CII → the vessel → Emission settings: choose the CII ship type and enter the deadweight (cargo ships and tankers) or gross tonnage (ro-ro, ro-pax, cruise). IRIS shows the attained and required CII and the A–E rating for the year so far.
Does my ship need a CII rating?
The CII rating, the IMO Data Collection System and the EU MRV / ETS are mandatory for ships of 5,000 GT and above. Smaller ships, tugs, barges and landing craft can still use the page to track fuel and CO₂.
How is the EU ETS counted?
On each voyage report choose EU ↔ EU / at berth (100 %) or EU ↔ non-EU (50 %). The allowances due are CO₂ × that share × the phase-in (40 % for 2024, 70 % for 2025, 100 % from 2026). Enter the allowance price to see the cost.
What do I send to class or the verifier?
Emissions & CII → DCS / MRV data (Excel): distance, hours underway, fuel by type, CO₂, CII and the EU share for each vessel. The verified report is still issued by your class or MRV verifier.
Why were some reports left out?
When the fuel on board went up without a bunkering the consumption is negative and cannot be used. Correct the ROB or record the bunkering on Voyage & Fuel.
Hours of rest & crew planning
How do I enter my hours of rest?
User menu → My hours of rest, or the Hours of rest tile in the Ship App (works offline). Click or drag over the half-hours you worked; empty cells are rest. Use a watch pattern or Same as day before to go faster.
What rules does IRIS check?
MLC 2006 and STCW: at least 10 hours of rest in any 24 hours and 77 hours in any 7 days; rest in no more than two periods, one of them at least 6 hours; no more than 14 hours between rest periods. Days that do not meet a rule turn red with the reason.
A drill or an emergency broke my rest. What do I write?
Record the hours as they were worked, then type the reason in the exception box (emergency, drill, safety of the ship). The day still shows as not meeting the rules, with your reason on the record.
Who signs the monthly record?
At the end of the month the seafarer presses Sign my record, then the Master presses Countersign. Print the Monthly record (PDF) and give the seafarer a copy. Changing a day afterwards clears both signatures so the month is signed again.
Can the Master or C/E enter hours for a crew member?
Yes. Users with the hours-of-rest permission (Master, Chief Engineer, Superintendent) can enter and correct the record of the crew on their vessel from Hours of Rest.
How do I plan crew changes?
Crew Planning: press Plan to set the contract end, the reliever and the day the reliever joins. IRIS warns when a relief is due within 30 days with no reliever, when a certificate expires before the sign-off date, after about 11 months on board, and when rest hours were not met in the last 7 days.
Reports
Which reports are there?
Maintenance compliance, overdue jobs, defects, running hours, availability & downtime, cost and budget, certificates and more. Every report exports to Excel.
How is compliance counted?
Planned jobs that fell due in the last 90 days; on time = done by the due date or hours plus the grace period.
My account, sign-in & sounds
How do I turn on two-factor sign-in?
User menu → Sign-in & SMS alerts. Scan the QR code with Google or Microsoft Authenticator and type the 6-digit code. Print the 8 recovery codes; each works once if you lose the phone.
How do I get SMS alerts?
User menu → Sign-in & SMS alerts: add your mobile number and choose the alerts (critical defect, vessel stopped, serious incident, PO to approve). The company must have SMS switched on.
How do I turn the sounds off or on?
User menu → Sounds: sounds on/off, the spoken "iris" on sign-in, volume and test buttons. In the Ship App, use the speaker button at the top. The setting is kept per device.
How do I change my password?
User menu → Change password.
Administration
How do I add a user?
Users → New user: name, e-mail, role and vessels. IRIS gives a temporary password to pass on; the person chooses their own at first sign-in. One account per person.
What happens when I deactivate a user?
They can no longer sign in, and all their Ship App devices stop syncing. Their history stays.
How are backups made?
Every night at 01:00 (database + files; the last 14 are kept). System Status → Back up now makes one on demand. Download one each week to keep a copy off the server.
How do I install an IRIS update?
IRIS support → System Updates: upload the IRIS update file (do not unzip it) and press Install. IRIS makes a backup first, updates, checks itself and rolls back by itself if anything fails. Only a Super Admin can install updates.
Where do I see who changed what?
Audit Trail: every change, sign-in and failed sign-in, with who and when.
What should System Status show?
All green: scheduler, queue, e-mail, backups, offsite copy, HTTPS and disk space. Fix anything red before go-live.